Bruce Road 6 East
Bruce County has retained Triton Engineering Services Limited to commence with the Environmental Assessment and detailed design of Bruce Road 6 E.
Phase 1 of the reconstruction was carried out in 2023/2024 and is completed.
Phase 2 of the reconstruction of Bruce Road 6 East A is planned to be carried out in 2027 under the direction of Triton Engineering and will extend from east of sideroad 20 to Grey Road 10.
Investigative work and detailed design will be carried out during 2026, with an opportunity for public consultation/input.
Phase 1 of the reconstruction was carried out in 2023/2024 and is completed.
Phase 2 of the reconstruction of Bruce Road 6 East A is planned to be carried out in 2027 under the direction of Triton Engineering and will extend from east of sideroad 20 to Grey Road 10.
Investigative work and detailed design will be carried out during 2026, with an opportunity for public consultation/input.
The project extends from George Street in Mildmay to Grey Road 10. The work will be completed in two phases and generally include:
- Phase 1: Reconstruction/rehabilitation of Bruce Road 6 East from Mildmay to Deemerton (George Street to east of Sideroad 20). The Municipality of South Bruce will also be reconstructing Sideroad 20 as part of this Phase. Phase 1 will also include the rehabilitation of the Carrick Creek Bridge and Meux Creek Bridge.
- Phase 2: Reconstruction/rehabilitation of Bruce Road 6 East from east of Sideroad 20 to Grey Road 10.
Phase 1 was completed in the spring of 2024.
Phase 2 is scheduled for construction in 2027/2028.
- Notice: Road Rehabilitation on Bruce Road 6 East News Release (July 12, 2024)
- Notice of Study Commencement Bruce Road 6 East Rehabilitation Environmental Assessment
- November 2021 Notice of Public Information Centre #1
- November 2021 Environmental Assessment and Detail Design Public Information Centre